A study estimates hundreds used about 2% of electricity.

U.S. hyperscale data centers — United States

A Harvard‑led analysis modeled 403 validated large U.S. data centers and, across operating‑load scenarios, estimated they used about 82 TWh of electricity from May 2024 to April 2025—roughly 1.8% of U.S. use—and were linked to about 25.7 million metric tons of CO2. Emissions varied widely with location because regional grids differ. The facility‑level estimates were published November 16, 2026 in Nature Sustainability.

Why it’s interesting

Fig. 052 Contours over a U.S. silhouette feed heavy cables into three racks, encoding location‑driven emissions differences and the estimated ~1.8% share of U.S. electricity used by 403 large centers in May 2024–April 2025.

Why it’s interesting

It puts a hard number on a fast‑growing, often guessed‑at load. It also shows that siting on a cleaner grid can change climate impact as much as sheer scale.

Aerial view of rows of rooftop cooling units and generators at a hyperscale data center.

Rows of rooftop cooling units and backup generators at a large data center, illustrative of the electricity demand and cooling needs behind modern cloud computing.

Photo: Rsparks3 · CC0. Cropped in social posts.

The longer version

Data centers are often discussed in sweeping totals, but their footprint depends on what is running and where the power comes from. A Harvard‑led team compiled facility‑level data for 403 validated U.S. hyperscale sites and modeled their likely operating loads from May 2024 to April 2025, then linked each site to the carbon intensity of its local grid.

Across scenarios, they estimated about 82 TWh of electricity (roughly 1.8% of U.S. use) and about 25.7 million metric tons of CO2, with wide regional differences reflecting local generation mixes. Scenario ranges were 68–99 TWh and 21–31 Mt CO2. The authors stress these are modeled, facility‑resolved estimates for the 403 sites studied, not metered totals or a census of every hyperscale facility. Published November 16, 2026 in Nature Sustainability.

Edition
No. 052
Date
Friday 20 November 2026
Subject
U.S. hyperscale data centers
Locality
United States
Period
May 2024–April 2025
Field
technology
Evidence
3 sources

See how we got here

Found after 17 research paths · Selected from 6 candidates

  1. 01 AI surge Servers drive new electricity loads.
  2. 02 Data centers Use has been rising and unevenly measured.
  3. 03 Hyperscale campuses 403 validated U.S. sites in the study.
  4. 04 Grid mix Emissions hinge on local generation.
  5. 05 Facility modeling Operating‑load scenarios at site level.
  6. 06 2024–2025 estimate ~82 TWh; ~1.8%; ~25.7 Mt CO2.
  7. → A study estimates hundreds used about 2% of electricity.

Sources

Nothing publishes without independent sources. How we verify →

  1. 1
    Environment: Assessing US data centre electricity usage (Nature Sustainability) — press release

    Nature Portfolio · 2026 · scientific organization

    Central estimates (82 TWh; ~1.8% of U.S. electricity; ~25.7 Mt CO2), scenario ranges (68–99 TWh; 21–31 Mt), study window (May 2024–April 2025), sample size (403), DOI, and note that emissions depend on regional generation mix.

    natureasia.com

  2. 2
    Hyperscale data centers’ energy consumption, carbon emissions newly estimated by researchers

    Harvard T.H. Chan School of Public Health · 2026 · university

    Facility‑level methodology, 403 facilities, study window (May 2024–April 2025), ~1.8% of U.S. electricity, ~25.7 Mt CO2, substantial regional differences tied to grid mix, and publication date/DOI.

    hsph.harvard.edu

  3. 3
    Study estimates magnitude of US data center pollution as climate talks unveil clean AI pledge

    Associated Press · 2026 · journalism

    Independent coverage confirming 403‑facility scope, study window (May 2024–April 2025), and ~25.7 million metric tons of CO2 estimate.

    apnews.com

Take it with you Challenge a friend ↗ SquareStoryWide Permanent link

THE DISPATCH / FROM ONE CURIOUS THING

CURIOSITY
IN YOUR INBOX.

Your dose of the unexpected, on your schedule.

One Curious Thing — one thing worth knowing, every day.

Enjoying these? Help keep the presses running.

Buy me a coffee Built By AndyBZ